Nail horizontally every 16.
Fraser siding installation instructions.
If there is something you need and it s not addressed below please feel free to contact us toll free.
Lap bottom sill plate by repairs and touch ups the following must be sealed using a minimum of two coats of fraser.
To align the shingles tack a board temporarily to the roof or draw a straight chalk line.
The bottom of the furring strips.
Vented all fraser wood siding warranties will be void.
Top bottom and both sides.
End to end siding joints no longer need to end on strapping furring studs.
Space siding or skirt board min.
Fraser evolution series makes installation a breeze by locking in every board on all four sides.
The distance between the centers of the laths must be equal to the width of the exposure.
Sip panels 1x3 kd actual 1 thickness strapping should be installed at 16 o c to give 1 of solid wood for nail penetration.
The hidden nail system provides a cleaner look by virtually eliminating the need for face nails.
Hingles must alw ays be nailed to 1 x 3 2 5 cm x 5 cm w ooden laths or a cedar breather t ype product installed according to the instructions included.
If your construction is of a different type please call fraser at 1 866 630 2495 for installation instructions.
To get all the benefits of vinyl siding ensure proper installation.
The following instructions pertain to the installation of fraser wood siding evolution series on a typical wood frame construction allowing for nail penetration of 1 min through the siding into solid wood every 16.
If there is a horizontal furring strip it must be removed.
Away from foundation.
Best practices for successful results vinyl siding installation manual created by the vinyl siding institute vsi this manual includes installation instructions based in part on astm d4756 standard practice for installation of rigid pvc siding and soffit.
Warning any installation of wood siding over a sip panel must receive an engineer s approval prior to installation.
Proper wall preparation ventilation and installation including proper nail size and nailing pattern is key to having the siding perform it s best.
Install the ventilated metallic starter strip directly on the furring strips.
Otherwise the wall will not be properly ventilated figure 5.
Home shingle installation we ve compiled the most frequently asked questions for our contractors architects and dealers to help you find what you re looking for.
Failure to follow the installation instructions would void the warranty.