The exposure on the first course of slates may be reduced by dropping the chalk line for the top of the second course of slates in order to increase the headlap on the starter course.
First row for roof.
Shifting them in this way will join the ends of the first regular row of shingles placed over the starter shingles.
Before you install your first shingle use your utility knife to cut 6 inches off of the side then lay it on your roof allowing the architectural shingles to hang between 1 2 to 2 inches over the edge.
If your roof s width is not an even multiple of the shingle s length you will have a partial piece on one end of each row.
Using a utility knife cut them off at the bottom of the adhesive strip.
You can either purchase starter strips or make your own by cutting shingles to size.
This will help determine how the shingles will lay on the roof width.
See below for a shopping list tools and steps subscr.
To begin installing the first shingles on your roof cut off the three tabs on the shingle.
The height distance up the roof of the starter slate must be at least 3 inches greater than the vertical exposure on the first course of slate.
When installing the paper you will overlap the felt paper per local building code usually 2 4.
Following the manufacturer s directions.
The first row of shingles is called a starter strip.
Start at the eave area just over the ice and water shield with a three inches of overlap about 3 and work your way up.
Lay the starter row of metal shingles at the drip edge and affix to the roof with metal roofing nails.
Ask this old house general contractor tom silva reveals the best ways to secure shingles to a roof.
Most asphalt shingles are 3 feet 91 4 centimeters in length.
Work up from the initial row starting at the lower corner in a diagonal pattern staggering the shingles to prevent gaps.
This should leave you with about 1 2 of the shingle left.
To make your own use the flat solid part of the shingles.
Lay the first row of shingles directly covering the narrow starter row.
Snap a horizontal chalk line over the starting row to use as a guide.
Begin your first row at the lower left corner of your roof.
For the first row of shingles called a starter course or strip you cut the tabs off three tab shingles and apply them with the self sealing adhesive strip facing up along the eave.
Cut six inches off the length of the first starter shingle nailed on then use the rest of them full size.